The Sunrise Powerlink is a, 120-mile long, 200 and 300-foot wide transmission line that runs from      El Centro to San Diego. PDC has successfully performed land surveying and right-of-way and engineering tasks for this project, working closely with SDG&E’s Land Services Department, including the many R/W agents involved in the acquisition process. Surveys were done and drawings prepared for the R/W corridor as well as for access roads, construction yards, staging areas, helicopter landing pads, and for off-site mitigation properties.

 

Services:

 

• Boundary Surveys

• Topographic Surveys

• Construction Surveys

 

 

 

 

 