PDC provided surveying, aerial mapping, and right-of-way engineering services for this project. The project was 12-mile 120” diameter bored tunnel with a 108” dia pipeline. The project included a hydroelectric generating station, surge facility, pump station, and two portals, four vertical shafts, and access roads.
Services:
Project Types
Urban/Mixed Use
Suburban
Institutional
Commercial/Retail
Hospitality/Entertainment
Public Works/Agencies
Utilities