PDC has been selected by North County Transit Development District (NCTD) to provide engineering and surveying services on a 3-year as-needed contract.

 

PDC also previously worked with NCTD on a 5-year, $10 million agreement for as-needed civil engineering and survey services. All survey and photogrammetry data for that contract was collected on a single NAD 83 coordinate system for inclusion and base of future GIS database.

 

Completed engineering work for NCTD includes:

 

  • Sorrento Valley Coaster Station:  PDC prepared construction documents for the expansion of the Sorrento Valley Coaster Station.  Plans included the design for an extended platform, parking lot, drop-off road, pedestrian crossing, and access ramps.

 

  • San Luis Rey Transit Center:   PDC prepared preliminary design drawings for a 2-acre transit center.  The design included preliminary grading, storm drain, water & sewer layout, as well as curbs, sidewalks and retaining walls.

 

  • Bus Stops: PDC prepared plans for over 80 bus stops within NCTD’s jurisdiction.  Plans for the bus stop improvements included curbs, sidewalks, bus stop pads, signage, retaining walls, and grading.

 

Services:

 

  • Engineering
  • Survey

Contact Us:

Phone:  619.235.6471